PC bed version end processing system
Measures to prevent spalling of precast PC floor slabs!
Our company offers the "PC slab edge treatment system," which reduces the risk of concrete spalling and enhances safety and quality, as the post-cast section is mostly not exposed on the surface. The working time per PC slab is approximately one hour, allowing for efficient coverage of PC steel materials. 【Benefits】 ■ No need for "formwork" when post-casting the filling material (labor-saving) ■ The post-cast section can be visually inspected from above, reducing the risk of filling defects (quality improvement) ■ Since the post-cast section is mostly not exposed on the surface, the risk of spalling is extremely low (enhanced safety and quality) *For more details, please download the PDF or contact us.
- Company:日本高圧コンクリート
- Price:Other